RE: moderator
Login | |
|
RE: moderator - 1/20/2006 2:51:47 PM
|
|
|
EMonz57
 Posts: 11693
Score: 0 Joined: 5/13/2005 Status: online
|
if your mechanicly inclinded.... I have seen people install the tearstone kit in 15 hours and a ripp modds SDS kit even faster than that
_____________________________
1993 Supra 6spd(OOOO\ ..... /OOOO)
|
|
|
|
|
|
RE: moderator - 1/20/2006 3:22:26 PM
|
|
|
Sanguinius
Ownz ALL threads Posts: 4762
Score: 0 Joined: 3/27/2005 Status: offline
|
Yes but I'm guessing these people ALSO had a full garage with all specialty tools required to do the job AND the know how of what they were doing. I'm talking about a guy that's doing it in spare time has probaly never done it before and may not have all the tools necessary.
_____________________________
|
|
|
|
RE: moderator - 1/20/2006 3:55:00 PM
|
|
|
eclipsed4u
Posts: 864
Score: 0 Joined: 9/6/2005 Status: offline
|
if 93eclipsegsx helps him, then im sure he could get it done in that amount of time. he could use the garage for the installing the engine parts. he wouldn't need a garage for the electrical stuff.
_____________________________
'03 Red Eclipse GT 5-spd Panasonic CQ-C8400U Head Unit, GReddy Evo II Exhaust, Injen CAI, 18' Konig Verdicts, Yokohama H4s, KYB AGX Shocks and Struts, Eibach Pro-kit, Powerslot Rotors, Hawk Pads, Euro Clear Corners, Black Taillights with Chrome rings
|
|
|
|
RE: moderator - 1/20/2006 7:08:48 PM
|
|
|
EMonz57
 Posts: 11693
Score: 0 Joined: 5/13/2005 Status: online
|
quote:
ORIGINAL: eclipsed4u if 93eclipsegsx helps him, then im sure he could get it done in that amount of time. he could use the garage for the installing the engine parts. he wouldn't need a garage for the electrical stuff. electrical should only take a matter of 20 minutes anyway and mechanical most is bolt up after the bumper is removed and TApping oil feeds is the hardest part
_____________________________
1993 Supra 6spd(OOOO\ ..... /OOOO)
|
|
|
|
|